1. Rojgarlive » 
  2. Competitive Exams » 
  3. NTPC Interview Schedule 2024 for Assistant Manager Posts Released Check Date Details at ntpc.co.in - 24 April 2024

NTPC Interview Schedule 2024 for Assistant Manager Posts Released Check Date Details at ntpc.co.in - 24 April 2024

NTPC Interview Schedule 2024: The National Thermal Power Corporation Limited (National Thermal Power Corporation Limited) has released the Interview Schedule for the Assistant Manager post on its ntpc.co.in and Candidates Can get their 29.04.2024 to 07.05.2024 of Assistant Manager in NTPC 2024 from this Page.

by Vinothini

Updated Apr 24, 2024

Advertisement

NTPC Interview Schedule 2024 for Assistant Manager Posts Released Check Date Details at ntpc.co.in - 24 April 2024

NTPC Assistant Manager Interview Schedule 2024 is officially notified.

The National Thermal Power Corporation Limited has announced the Interview Schedule for NTPC Assistant Manager 2024. The interviews were conducted in various centers across the country/state, and the results have also been released.

Now, the NTPC Assistant Manager Interview Schedule 2024 has been announced. Important dates and further details regarding the Interview Schedule for 2024 can be found in the following table.

NTPC Assistant Manager Interview Schedule 2024 - Outline

NTPC Assistant Manager Interview Schedule 2024

Company Name

National Thermal Power Corporation Limited

Name of the Post

Assistant Manager

Official Date

23.04.2024

Date of Interview

29.04.2024 to 07.05.2024

Category

Interview Schedule

Official PDF Link

NTPC Assistant Manager Interview Schedule 2024

Official Website

ntpc.co.in

The National Thermal Power Corporation Limited has officially announced the NTPC Assistant Manager Interview Schedule 2024. Candidates who applied for the Assistant Manager post can now check the schedule.

To access the NTPC Assistant Manager Interview Schedule 2024, candidates can download it from the official link provided below. The schedule will list out the interview dates for all provisionally shortlisted candidates from the conducted examination for NTPC Assistant Manager 2024.

Check and Download - NTPC Assistant Manager Interview Schedule 2024

Article continues below advertisement
Article continues below advertisement

How to check and download the NTPC Assistant Manager Interview Schedule 2024?

Below are the steps to download the NTPC Assistant Manager Interview Schedule 2024. Candidates can follow these instructions to check and download their schedule without any difficulties.

Step 1: Visit the National Thermal Power Corporation Limited website ntpc.co.in

Step 2: Navigate to the search option on the homepage.

Step 3: Enter "NTPC Assistant Manager Interview Schedule 2024" in the search bar.

Step 4: Download the NTPC Assistant Manager Interview Schedule 2024 once it appears in the search results.

Article continues below advertisement
Article continues below advertisement

NTPC Assistant Manager Interview Schedule 2024

After successfully conducting the examination for the post of Assistant Manager, the National Thermal Power Corporation Limited (NTPC) has announced the Assistant Manager Interview Schedule 2024 following the declaration of results.

Candidates selected from the merit list and shortlisted can now check and download the NTPC Assistant Manager Interview Schedule 2024 from the official website of NTPC.

About National Thermal Power Corporation Limited

The National Thermal Power Corporation Limited (NTPC) is a central public sector undertaking (PSU) owned by the Government of India and the Ministry of Power. Established in 1975, it stands as India's largest power company, boasting an installed capacity of 72,304 MW. NTPC operates 89 power stations across various Indian states, either independently or through joint ventures (JVs) and subsidiaries.

It comprises 18 coal-based and 7 gas-based stations, along with additional stations in JV/subsidiary companies, as well as hydro-based and wind-based stations. NTPC envisions providing reliable power and related solutions economically, efficiently, and in an environmentally friendly manner, driven by innovation and agility. It aims to achieve a capacity of 130 GW by 2032.




NTPC Interview Schedule 2024 - FAQ

1. What is the National Thermal Power Corporation Limited (NTPC)?

NTPC is a central public sector undertaking (PSU) owned by the Government of India and the Ministry of Power.

2. What is the installed capacity of NTPC?

NTPC has an installed capacity of 72,304 MW, making it India's largest power company.

3. What is NTPC's vision and future target?

NTPC aims to provide reliable power and related solutions economically, efficiently, and in an environmentally friendly manner. It targets to become a 130 GW firm by 2032.

Recent Articles

Advertisement